简体中文
PRODUCT DISPLAY
EQ21-11
    Publish time 2023-08-07 14:40    

Test products, copper ball valve, pipefittings dualuse, the program can be easily switched to solve the problem ofball alve with handle, planeleakageand hole leakage, the ball automatic pressure control after detection, to ensure the quality of products, quipment operation is simple, easy trainingcan use the production capacity of 8 hours 5000-6o00.

EQ21-11